{"id":5161,"date":"2023-02-27T02:24:32","date_gmt":"2023-02-27T02:24:32","guid":{"rendered":"https:\/\/course.oeru.org\/ipm103\/?page_id=5161"},"modified":"2023-02-27T02:24:32","modified_gmt":"2023-02-27T02:24:32","slug":"tasks-resource-requirements-challenge","status":"publish","type":"page","link":"https:\/\/course.oeru.org\/ipm103\/learning-pathways\/resources\/tasks-resource-requirements-challenge\/","title":{"rendered":"Tasks &#8211; Resource requirements challenge"},"content":{"rendered":"<div id=\"content\" class=\"mw-body container\" role=\"main\">\n<div class=\"row\">\n<div class=\"col-md-12\">\n<div class=\"panel\">\n<div class=\"panel-body\">\n<div id=\"bodyContent\">\n<div id=\"mw-content-text\" lang=\"en\" dir=\"ltr\" class=\"mw-content-ltr\">\n<p>In this activity, you will work out the resources required for each task in your own project. You can draw on a range of the techniques to estimate resources required and duration of activities. At this stage, all that is required is what you need. When you look at time and scheduling, we can integrate what you need with when it is or is not available.\n<\/p>\n<ol>\n<li> Based on the project you have selected, create a table showing the individual tasks required in the project and the resources required to complete them.\n<ul>\n<li> This is always a &#8216;best estimate&#8217; at this point in planning.\n<\/li>\n<li> You should assume that this list will change as you work through the three learning paths.\n<\/li>\n<li> For example, you may at this point plan to use your own staff to do a job, but when you look at quality, you may need to contract more specialised staff to complete it to requirements.\n<\/li>\n<\/ul>\n<\/li>\n<li> Use a table similar to this to compile your resource requirements:\n<\/li>\n<\/ol>\n<p><!-- WEtheme eyJwIjoiT0VSZiIsImNzcyI6ImNzc1wvZm9udC1hd2Vzb21lXC9jc3NcL2ZvbnQtYXdlc29tZS5taW4uY3NzIiwiaGVhZGVyIjoiYmx1ci5odG1sIn0= -->\n<\/p>\n<table class=\"oeru1 table table-striped\" style=\"margin-left: auto; margin-right: auto;\">\n<caption> <b>Project Name &#8211; Project Manager<\/b><br \/>\n<\/caption>\n<tbody>\n<tr>\n<th>Task Name\n<\/th>\n<th>Staff required\n<\/th>\n<th>Hours of work\n<\/th>\n<th>Facilities\n<\/th>\n<th>Equipment\n<\/th>\n<th>Other\n<\/th>\n<\/tr>\n<tr>\n<td>&nbsp; <\/td>\n<td> <\/td>\n<td> <\/td>\n<td> <\/td>\n<td> <\/td>\n<td>\n<\/td>\n<\/tr>\n<tr>\n<td>&nbsp; <\/td>\n<td> <\/td>\n<td> <\/td>\n<td> <\/td>\n<td> <\/td>\n<td>\n<\/td>\n<\/tr>\n<tr>\n<td>&nbsp; <\/td>\n<td> <\/td>\n<td> <\/td>\n<td> <\/td>\n<td> <\/td>\n<td>\n<\/td>\n<\/tr>\n<tr>\n<td>&nbsp; <\/td>\n<td> <\/td>\n<td> <\/td>\n<td> <\/td>\n<td> <\/td>\n<td>\n<\/td>\n<\/tr>\n<tr>\n<td>&nbsp; <\/td>\n<td> <\/td>\n<td> <\/td>\n<td> <\/td>\n<td> <\/td>\n<td>\n<\/td>\n<\/tr>\n<tr>\n<td>&nbsp; <\/td>\n<td> <\/td>\n<td> <\/td>\n<td> <\/td>\n<td> <\/td>\n<td>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3><span class=\"mw-headline\" id=\"Marking_Rubric\">Marking Rubric<\/span><\/h3>\n<p>Use the rubric below to work out if you have done a good job. This is the same rubric that will be used to mark your assessment if you choose to be formally assessed.\n<\/p>\n<p><!-- WEtheme eyJwIjoiT0VSZiIsImNzcyI6ImNzc1wvZm9udC1hd2Vzb21lXC9jc3NcL2ZvbnQtYXdlc29tZS5taW4uY3NzIiwiaGVhZGVyIjoiYmx1ci5odG1sIn0= -->\n<\/p>\n<table class=\"oeru1 table table-striped\">\n<tbody>\n<tr>\n<th>Criteria\n<\/th>\n<th>Marks\n<\/th>\n<\/tr>\n<tr>\n<td>The list of resources required is detailed and comprehensive.<br \/>The range of different types of resources includes all that are required.<br \/>The specific quantities of all resources are identified.\n<\/td>\n<td>4-5\n<\/td>\n<\/tr>\n<tr>\n<td>The list of resources includes enough detail to estimate the resources required.<br \/>Some types of resources that are relevant may be missing.<br \/>An indication of the amount of resources required is provided.\n<\/td>\n<td>2-3\n<\/td>\n<\/tr>\n<tr>\n<td>The list of resources appears to be incomplete with some areas missing,<br \/>not all resource types described, and some quantities not specified.\n<\/td>\n<td>0-1\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><!-- \nNewPP limit report\nCPU time usage: 0.009 seconds\nReal time usage: 0.009 seconds\nPreprocessor visited node count: 11\/1000000\nPreprocessor generated node count: 32\/1000000\nPost\u2010expand include size: 0\/2097152 bytes\nTemplate argument size: 0\/2097152 bytes\nHighest expansion depth: 2\/40\nExpensive parser function count: 0\/100\n--><\/p>\n<p><!-- Saved in parser cache with key we_en-mw_:pcache:idhash:179011-0!*!*!*!*!*!* and timestamp 20230227022238 and revision id 1023380\n -->\n<\/div>\n<div class=\"visualClear\"><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"row\">\n<div class=\"col-md-12\">\n<ul class=\"pager\">\n<li class=\"previous\">\n            <a href=\"\/ipm103\/learning-pathways\/resources\/start-resource-requirements-challenge\">\u2190 Previous<\/a>\n          <\/li>\n<li class=\"next\">\n            <a href=\"\/ipm103\/learning-pathways\/resources\/outputs-resource-requirements-challenge\">Next \u2192<\/a>\n          <\/li>\n<\/ul><\/div>\n<\/p><\/div>\n<div id=\"wenote-ids\"><script type='text\/javascript' id='wenotes-ids'>\n    var WEnotesSite = \"https:\/\/wikieducator.org\";\n    var WEnotesPath = \"\/Introduction_to_project_management\/IPM103\/Resources\/Tasks_Resources\";\n    var WEnotesSiteID = \"0e3d258fbd36841f92259eefcd41d5e9\";\n    var WEnotesPathID = \"285abb80d61ff301ddc13ccd1bc792d9\";\n    var WEnotesIDs = { site: \"https:\/\/wikieducator.org\", path: \"\/Introduction_to_project_management\/IPM103\/Resources\/Tasks_Resources\", site_id: \"0e3d258fbd36841f92259eefcd41d5e9\", path_id: \"285abb80d61ff301ddc13ccd1bc792d9\" };\n<\/script><\/div>\n<\/div>\n<footer><\/footer>\n","protected":false},"excerpt":{"rendered":"<p>In this activity, you will work out the resources required for each task in your own project. You can draw on a range of the techniques to estimate resources required and duration of activities. At this stage, all that is required is what you need. When you look at time and scheduling, we can integrate [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":5147,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-5161","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/course.oeru.org\/ipm103\/wp-json\/wp\/v2\/pages\/5161","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/course.oeru.org\/ipm103\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/course.oeru.org\/ipm103\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/course.oeru.org\/ipm103\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/course.oeru.org\/ipm103\/wp-json\/wp\/v2\/comments?post=5161"}],"version-history":[{"count":1,"href":"https:\/\/course.oeru.org\/ipm103\/wp-json\/wp\/v2\/pages\/5161\/revisions"}],"predecessor-version":[{"id":5162,"href":"https:\/\/course.oeru.org\/ipm103\/wp-json\/wp\/v2\/pages\/5161\/revisions\/5162"}],"up":[{"embeddable":true,"href":"https:\/\/course.oeru.org\/ipm103\/wp-json\/wp\/v2\/pages\/5147"}],"wp:attachment":[{"href":"https:\/\/course.oeru.org\/ipm103\/wp-json\/wp\/v2\/media?parent=5161"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}